Guaranteeing uninterrupted power has never been more important for facilities managers. Site survey, early in the specification process, is vital for a successful UPS installation and future business continuity.

Above 5kVA, a reputable UPS supplier will usually recommend a site survey. For such installations, the site generally requires a little more thought about health and safety risk assessments, method statements, logistics and floor loadings, electrical installation, remote monitoring, environment and aftercare. Below 5kVA, surveys are less usual unless there are specific installation issues, such as those associated with long runtime battery packs.

Site survey is integral to successful UPS selection

For facilities teams, intent on optimum business continuity, site surveys should be an integral part of the pre-sale process. They offer the perfect opportunity to discuss the uninterruptible power supply installation with the manufacturer's technical energy consultant (TEC). Trust and communication established at this stage often sets the pattern for a successful relationship.

A key part of UPS specification involves identifying both critical, essential and non-essential loads. It's an inherently complex task that inevitably draws on site observations as well as theoretical data. Significantly, there's a distinct difference between the power ratings on rear panel labels and those in operating manuals; that's why ascertaining actual load ratings involves measuring the values drawn from the local distribution panel. This type of assessment is hard to achieve without specialist uninterrupted power knowledge and a site visit.

Similarly, Power over Ethernet (PoE) applications often require upgraded capacity. With the criticality of certain applications dictating the degree of protection required, network managers need a sound overview of applications and equipment. During the site survey, a comprehensive network overview can establish this alongside highlighting how it is departmentalised. For example, if one component is shut down, how many other departments will continue to enjoy uninterrupted power?

With every square metre having to earn its keep, space planning is vital. This requires comprehensive understanding of current and planned loads and their role in business continuity. It is particularly important for a high-density datacenter and requires careful consideration of existing and future cooling and power requirements. The significance of the trade-off between uninterruptible power supply footprints (UPS and batteries) and revenue-earning hardware should not be ignored. Should server space be given over to UPS and batteries or should they be housed elsewhere?

When specifying UPS for uninterrupted power, everyone wants to avoid the risks of over- or under-specification. A site survey, enabling exploration of power protection needs, can help avoid this. An optimally specified uninterruptible power supply solution can only be procured from a supplier that truly understands the subject, an organisation's vulnerabilities, complexities and business continuity objectives - hard to achieve without visits and site surveys.

In many ways, the science of uninterrupted power is less about electrical engineering than the dynamics of departmental interaction. Not least, it's about the increased susceptibility to power issues of remote loads at the edge of the grid. Not only are power cuts more frequent here, but problems such as sags and surges too. A thorough site survey, allied to proven UPS technology, is essential. It also provides the structure for good documentation going forward, which in today's dynamic and fast-moving business environments is a must.

Last but not least are the challenges of location, architecture and site availability. As well as creating site-specific needs, failure to properly understand the implications of these could jeopardise installation, UPS operation, maintenance of uninterrupted power and business continuity. Physical location of a UPS, the means of accessing its location, load-bearing capabilities and working regimes during and after installation are all better understood from on-site.

Designing, installing and operating UPS for uninterrupted power may seem complicated. It needn't be, with support from a suitably experienced vendor and proper preparation. For a start, there's The Power Protection Guide, written by power continuity experts Robin Koffler and Jason Yates of Riello UPS and published by entiveon, with its detailed information on designing and implementing secure power continuity. The next step is to enter into a consultative partnership with a reputable manufacturer and get them to site to fully understand the business continuity challenges.


The Importance Of Site Surveys When Specifying Uninterruptible Power Supplies

Lasko Air Cheap

Tuesday, December 27, 2011

Thursday, December 15, 2011

Ex Rt 5/7Kva Transformer Module

!±8± Ex Rt 5/7Kva Transformer Module


Rate : | Price : $1,600.26 | Post Date : Dec 15, 2011 04:48:11
Usually ships in 6-10 business days

Item #: CA1326. This is a Special Order Item. Please allow up to 7 business days for product to ship. The Eaton EX 5/7 RT Transformer (formerly marketed under the MGE Office Protection Systems brand and now part of the Pulsar series) is a high density, rackmountable step-down transformer and PDU designed for plug-in connectivity of low voltage devices connected to a EX 5/7 RT UPS. It shares the same slick design as the rest of the EX RT family to form a robust solution for IT environment with a combination of high and low voltage equipment.

Device Type: Transformer - external
Rack Size: 19" - 3U
Dimensions (WxDxH): 17.5 in x 25 in x 5.2 in
Weight: 173.1 lbs
Output Voltage: AC 120/208/240 V ( 50/60 Hz )
Power Capacity: 7000 VA
Customers also search for: Technology\Surge, UPS and Batteries\UPS and Batteries\UPS and Backups Discount Eaton EX RT Transformer Module - Transformer - 7000 VA, Buy Eaton EX RT Transformer Module - Transformer - 7000 VA, Wholesale Eaton EX RT Transformer Module - Transformer - 7000 VA, 0743172023988, 86311, UPS and Backups

Bose Am10 Buy Online Keen Sarasota Sandals Review Cheap Tickets To Emeril Live


Twitter Facebook Flickr RSS



Français Deutsch Italiano Português
Español 日本語 한국의 中国简体。







Sponsor Links